03-29-2013 Day 19

Third coat of mud was applied today. Some areas did not get the third coat because it was in a tight corner and doing the second side of the corner would damage the first side.

While inspecting the work later after Ben left, I tried to open the basement window and found that all of the mudded corners around the window was preventing the opening of the window. I called Bill and advised him about the issue. He said it would be handled when they come back in.

While talking to Bill he let me know that my bathroom window would arrive soon via UPS.  As soon as it does arrive they can get workers in to install it.