Basement:
Ben was onsite to work on the base boards and other misc items. He is targeting to be done tomorrow.
Bathroom Window:
No work was completed today. I put a level on the tiles at the bottom of the window to see if the back side of them were raised. We (Bill, Max, Matt and myself) had discussed this point to ensure that if water got in the window area it would run back into the tub. Not sure what is going to happen with this window.
Paver Patio:
Kyle was onsite and started to lay the steps and retaining wall for the planter area.